📝 Event: 2026-02-24_installation_acceptance_and_laser_baseline
📊 Report Overview
Event Metadata
Record Type
Maintenance Event
Maintenance Event
Reason / Suite
Install
Install
Service Provider
vendor
vendor
Instrument
scope-andor-bc43Maintenance Action
Reason Details:
Post-installation setup verification and acceptance testing after BC43 delivery.
Post-installation setup verification and acceptance testing after BC43 delivery.
Action Details:
Ensured correct setup and Fusion/Windows-related settings. Tested imaging workflow from sample-holder and incubation chamber setup/calibration through Montage, Z-Scan, Multichannel Transmitted Light, and Joystick operation using provided sample slides. Verified integrity of objectives and optical pathway. Completed setup and calibration of the Okolab incubation system. Measured laser output using calibrated laser slides: 405 nm = 18 mW, 488 nm = 12 mW, 561 nm = 13 mW, 638 nm = 16 mW.
Ensured correct setup and Fusion/Windows-related settings. Tested imaging workflow from sample-holder and incubation chamber setup/calibration through Montage, Z-Scan, Multichannel Transmitted Light, and Joystick operation using provided sample slides. Verified integrity of objectives and optical pathway. Completed setup and calibration of the Okolab incubation system. Measured laser output using calibrated laser slides: 405 nm = 18 mW, 488 nm = 12 mW, 561 nm = 13 mW, 638 nm = 16 mW.
Status After Fix:
IN_SERVICE
Additional Notes
Installation engineer completed commissioning checks and confirmed instrument readiness for routine operation.
📄 Raw YAML Ledger
View 2026-02-24_installation_acceptance_and_laser_baseline.yaml
schema_version: 1
record_type: maintenance_event
maintenance_id: "maint_scope-andor-bc43_20260224_installation_acceptance"
microscope: "scope-andor-bc43"
service_provider: "vendor"
company: "Andor"
contact: "Installation engineer"
reference: "BC43 installation and acceptance visit"
started_utc: "2026-02-24T08:30:00Z"
ended_utc: "2026-02-24T12:30:00Z"
reason: "install"
reason_details: >
Post-installation setup verification and acceptance testing after BC43 delivery.
action: "calibrate"
action_details: >
Ensured correct setup and Fusion/Windows-related settings. Tested imaging workflow from
sample-holder and incubation chamber setup/calibration through Montage, Z-Scan,
Multichannel Transmitted Light, and Joystick operation using provided sample slides.
Verified integrity of objectives and optical pathway. Completed setup and calibration of
the Okolab incubation system. Measured laser output using calibrated laser slides:
405 nm = 18 mW, 488 nm = 12 mW, 561 nm = 13 mW, 638 nm = 16 mW.
microscope_status_before: "out_of_service"
microscope_status_after: "in_service"
downtime_hours: 4.0
related_qc:
- "qc_scope-andor-bc43_20260224T110000Z_laser_baseline"
attachments: []
tags: ["installation", "acceptance", "calibration", "laser-power", "okolab"]
followup: >
Use calibrated laser slides for routine power baseline checks and log future values in QC
sessions.
next_due_date: "2026-03-24"
notes: >
Installation engineer completed commissioning checks and confirmed instrument readiness
for routine operation.