📝 Event: 2025-06-19_stage_backlash_adjustment
📊 Report Overview
Event Metadata
Record Type
Maintenance Event
Maintenance Event
Reason / Suite
Problem
Problem
Service Provider
internal
internal
Instrument
scope-testx1Maintenance Action
Reason Details:
XY tiling jobs showed 1-2 frame overlap mismatch near the right edge, consistent with increasing stage backlash.
XY tiling jobs showed 1-2 frame overlap mismatch near the right edge, consistent with increasing stage backlash.
Action Details:
Re-homed stage axes, tightened X-axis coupling set screw, recalibrated pixel size/step conversion in acquisition software, and validated with a 6x6 tile phantom run.
Re-homed stage axes, tightened X-axis coupling set screw, recalibrated pixel size/step conversion in acquisition software, and validated with a 6x6 tile phantom run.
Status After Fix:
LIMITED
Additional Notes
Imaging resumed same afternoon, but instrument kept in limited mode for high-precision tiling only.
📄 Raw YAML Ledger
View 2025-06-19_stage_backlash_adjustment.yaml
schema_version: 1
record_type: maintenance_event
maintenance_id: "maint_scope-testx1_20250619_stage_backlash_adjustment"
microscope: "scope-testx1"
service_provider: "internal"
company: "AIC Turku Microscopy Core"
contact: "On-call staff: Mikko Salonen"
reference: "INT-CORE-2025-233"
started_utc: "2025-06-19T12:10:00Z"
ended_utc: "2025-06-19T14:00:00Z"
reason: "problem"
reason_details: >
XY tiling jobs showed 1-2 frame overlap mismatch near the right edge,
consistent with increasing stage backlash.
action: "align"
action_details: >
Re-homed stage axes, tightened X-axis coupling set screw,
recalibrated pixel size/step conversion in acquisition software,
and validated with a 6x6 tile phantom run.
microscope_status_after: "limited"
downtime_hours: 1.8
related_qc:
- "qc_scope-testx1_20250619T1110Z_stagegrid_v1"
- "qc_scope-testx1_20250620T0745Z_stagegrid_v1"
attachments:
- "maintenance/events/scope-testx1/2025/attachments/2025-06-19_stage_validation.csv"
tags: ["stage", "alignment", "tiling", "internal"]
followup: >
Keep tile overlap at 12% minimum until next full vendor mechanical inspection.
next_due_date: "2025-09-01"
notes: >
Imaging resumed same afternoon, but instrument kept in limited mode for high-precision tiling only.