📝 Event: 2018-02-05_preventative_maintenance
Work in progress
This dashboard is a work in progress. Please independently verify critical information, as not all features are working yet.
📊 Report Overview
Event Metadata
Record Type
Maintenance Event
Maintenance Event
Reason / Suite
Preventative_maintenance
Preventative_maintenance
Service Provider
vendor
vendor
Instrument
scope-3i-csu-w1-spinning-diskMaintenance Action
Reason Details:
preventative_maintenance
preventative_maintenance
Action Details:
Preventative Maintenance Visit. Addressed EMCCD connectivity issues by replacing the fire-wire board and cable, and re-installing the PVCAM 3.7.1 driver. Kohler alignment was fully off and was corrected. The incubator housing clamp was noted as slightly broken. Surfaces, monitor, and optics were cleaned. Vector, FRAP, and SDC paths were realigned.
Preventative Maintenance Visit. Addressed EMCCD connectivity issues by replacing the fire-wire board and cable, and re-installing the PVCAM 3.7.1 driver. Kohler alignment was fully off and was corrected. The incubator housing clamp was noted as slightly broken. Surfaces, monitor, and optics were cleaned. Vector, FRAP, and SDC paths were realigned.
📄 Raw YAML Ledger
View 2018-02-05_preventative_maintenance.yaml
record_type: maintenance_event
microscope: scope-3i-csu-w1-spinning-disk
maintenance_id: maint-2018-02-05-pm
started_utc: '2018-02-05T09:00:00Z'
completed_utc: '2018-02-06T17:00:00Z'
status: completed
reason: preventative_maintenance
action: part_replacement
action_details: 'Preventative Maintenance Visit. Addressed EMCCD connectivity issues
by replacing the fire-wire board and cable, and re-installing the PVCAM 3.7.1 driver. Kohler
alignment was fully off and was corrected. The incubator housing clamp was noted
as slightly broken. Surfaces, monitor, and optics were cleaned. Vector, FRAP, and
SDC paths were realigned.
'
service_provider: vendor
company: 3i (Intelligent Imaging Innovations)
contact: 3i Field Service Engineer
status_notes: Fully functional